{"id":1068,"date":"2016-06-24T10:43:43","date_gmt":"2016-06-24T14:43:43","guid":{"rendered":"https:\/\/www.mroelectric.com\/blog\/?p=1068"},"modified":"2020-03-05T11:17:27","modified_gmt":"2020-03-05T16:17:27","slug":"6sn1123-1aa00-0ea1-configuration-setup","status":"publish","type":"post","link":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/","title":{"rendered":"6SN1123-1AA00-0EA1 Configuration and Setup"},"content":{"rendered":"<div data-canvas-width=\"511.0650000000003\">The steps for <a href=\"https:\/\/www.mroelectric.com\/product\/6SN1123-1AA00-0EA1\">1p 6SN1123-1AA00-0EA1<\/a> Manual Configuration and Setup are below as a follow up to our previous entry <a href=\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-beyond-user-manual\/\">here<\/a>.<\/div>\n<div data-canvas-width=\"511.0650000000003\">&nbsp;<\/div>\n<h6 data-canvas-width=\"511.0650000000003\"><strong>Start-up Possibilities for 1p 6SN1123-1AA00-0EA1 Configuration<\/strong><\/h6>\n<div data-canvas-width=\"511.0650000000003\">\n<div data-canvas-width=\"35.85\">using<\/div>\n<div data-canvas-width=\"390.4200000000001\">\u0001- operator control and display elements (refer to Section 1.3)<\/div>\n<div data-canvas-width=\"491.02500000000015\">\u0001- RS232C interface with an IBM AT\u2013compatible computer and start\u2013up soft-<\/div>\n<div data-canvas-width=\"156.57\">ware<\/div>\n<div data-canvas-width=\"156.57\">&nbsp;<\/div>\n<\/div>\n<div data-canvas-width=\"156.57\"><strong>Re-initialize Drive Converter (if required)<\/strong><\/div>\n<div data-canvas-width=\"511.0650000000003\">If an already initialized drive\u2013converter is to be re\u2013initialized, then proceed as<\/div>\n<div data-canvas-width=\"50.01\">follows:<\/div>\n<div data-canvas-width=\"328.03499999999997\">\u0001- if required, back\u2013up the setting data (parameters)<\/div>\n<div data-canvas-width=\"39.96\">\u0001- remove write protection: Set P\u2013051 to 4H<\/div>\n<div data-canvas-width=\"39.96\">\u0001- start initialization: Set P\u2013097 to 0H<\/div>\n<div data-canvas-width=\"124.15500000000003\">\u0001- overwrite the parameters in the drive\u2013machine data memory: Set P\u2013052 to 1H, and wait until P\u2013052 resets itself to 0H.<\/div>\n<div data-canvas-width=\"107.43\">\u0001- power\u2013on reset:<\/div>\n<div data-canvas-width=\"90.825\">Power\u2013down the unit and power\u2013up approximately 2 s after the display has disappeared:<\/div>\n<div data-canvas-width=\"215.28\">P\u2013095 must then appear in the display.<\/div>\n<div data-canvas-width=\"142.30499999999998\">\u0001- initialize<\/div>\n<div data-canvas-width=\"142.30499999999998\">&nbsp;<\/div>\n<div data-canvas-width=\"142.30499999999998\"><strong>Firmware Replacement (if required)<\/strong><\/div>\n<div data-canvas-width=\"508.78499999999997\">The firmware can be replaced using the user\u2013prompted start\u2013up software for<\/div>\n<div data-canvas-width=\"426.96000000000004\">main spindle\u2013 and induction motor modules, from version V2.00.<\/div>\n<div data-canvas-width=\"102.61333333333333\">&nbsp;<\/div>\n<div data-canvas-width=\"102.61333333333333\">Firmware release<\/div>\n<div data-canvas-width=\"40.026666666666664\">before FW 3.00 -&gt; 6SN1121\u20130BA1_\u20130AA0<\/div>\n<div data-canvas-width=\"140.79999999999998\">from FW3.00 -&gt; 6SN1121\u20130BA11\u20130AA1<\/div>\n<div data-canvas-width=\"73.365\">&nbsp;<\/div>\n<div data-canvas-width=\"73.365\">Procedure:<\/div>\n<div data-canvas-width=\"228.20999999999995\">\u0001- back\u2013up setting data (parameters)<\/div>\n<div data-canvas-width=\"318.84000000000003\">\u0001- replace the firmware using the start\u2013up program<\/div>\n<div data-canvas-width=\"400.39500000000015\">\u0001- initialize with the pulses and controller inhibited<\/div>\n<div data-canvas-width=\"208.23000000000005\">\u0001- re\u2013load the backed\u2013up settings<\/div>\n<div data-canvas-width=\"486.15000000000003\">\u0001- back\u2013up the setting data in the drive\u2013machine data memory<\/div>\n<div data-canvas-width=\"486.15000000000003\">&nbsp;<\/div>\n<div data-canvas-width=\"486.15000000000003\"><strong>Start-up of series machines, module replacement, component replacement<\/strong><\/div>\n<div data-canvas-width=\"529.5150000000001\">The drive converter setting data (parameters) can be saved on floppy disk using<\/div>\n<div data-canvas-width=\"528.1200000000001\">the start\u2013up software. Proceed as follows to start\u2013up additional drive converters<\/div>\n<div data-canvas-width=\"197.43000000000004\">(start\u2013up of series machines):<\/div>\n<div data-canvas-width=\"323.76000000000005\">1.Initialize with the pulses and controllers inhibited:<\/div>\n<div data-canvas-width=\"10.739999999999998\">Enter P\u2013095 power module code number<\/div>\n<div data-canvas-width=\"405.2550000000002\">\u2013 Motor code number and motor encoder pulse number are saved on the floppy disk, and therefore do not have to be entered.<\/div>\n<div data-canvas-width=\"129.75000000000006\">\u2013 Start initialization.<\/div>\n<div data-canvas-width=\"342.9900000000002\">2. Load and save the setting data from the floppy disk.<\/div>\n<div data-canvas-width=\"342.9900000000002\">&nbsp;<\/div>\n<div data-canvas-width=\"342.9900000000002\">For more info or a&nbsp;1p 6SN1123-1AA00-0EA1 price you can email <a href=\"mailto:sales@mroelectric.com\">sales@mroelectric.com<\/a> or call <a href=\"tel:800-691-8511\">1-800-691-8511<\/a>.<\/div>\n<div data-canvas-width=\"342.9900000000002\"><a href=\"mailto:sales@mroelectric.com?subject=Request%20for%20Quote&amp;body=Part%20%23%20%28s%29%3A%20%0A%0AQuantity%3A%20%0A%0AManufacturer%3A%20%0A%0ANew%20%2F%20Reman%3A%20%0A%0A%0ADescription%20%2F%20Comments%20%2F%20Urgency%3A%20%0A%0ACompany%20Name%3A%20%0A%0AContact%20Name%3A%20\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1171\" src=\"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/2016\/07\/quote-btn.png\" alt=\"\" width=\"292\" height=\"62\"><\/a><\/div>\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/IMG_1042-e1561569973256-768x1024.jpg\" alt=\"\" class=\"wp-image-4002\" srcset=\"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/IMG_1042-e1561569973256-768x1024.jpg 768w, https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/IMG_1042-e1561569973256-225x300.jpg 225w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The steps for 1p 6SN1123-1AA00-0EA1 Manual Configuration and Setup are below as a follow up to our previous entry here. &nbsp; Start-up Possibilities for 1p 6SN1123-1AA00-0EA1 Configuration using \u0001- operator control and display elements (refer to Section 1.3) \u0001- RS232C interface with an IBM AT\u2013compatible computer and start\u2013up soft- ware &nbsp; Re-initialize Drive Converter (if [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_lmt_disableupdate":"","_lmt_disable":"","_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"ngg_post_thumbnail":0,"footnotes":""},"categories":[235,12],"tags":[85,178],"class_list":["post-1068","post","type-post","status-publish","format-standard","hentry","category-siemens","category-troubleshooting-and-repair","tag-motors-and-drives","tag-setup-and-configuration"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.3.1 (Yoast SEO v25.3.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Siemens 6SN1123-1AA00-0EA1 Configuration and Setup<\/title>\n<meta name=\"description\" content=\"6SN1123-1AA00-0EA1 Configuration and Setup Information. MRO Electric and Supply has new and refurbished modules available with free same-day shipping.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"6SN1123-1AA00-0EA1 Configuration and Setup\" \/>\n<meta property=\"og:description\" content=\"6SN1123-1AA00-0EA1 Configuration and Setup Information. MRO Electric and Supply has new and refurbished modules available with free same-day shipping.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/\" \/>\n<meta property=\"og:site_name\" content=\"MRO Electric Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/mroelectric\/\" \/>\n<meta property=\"article:published_time\" content=\"2016-06-24T14:43:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-03-05T16:17:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/2016\/07\/quote-btn.png\" \/>\n<meta name=\"author\" content=\"Joe Kaminski\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@mroelectric\" \/>\n<meta name=\"twitter:site\" content=\"@mroelectric\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Joe Kaminski\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/\"},\"author\":{\"name\":\"Joe Kaminski\",\"@id\":\"https:\/\/www.mroelectric.com\/blog\/#\/schema\/person\/b993515a2417163a23dfe88597c8d13a\"},\"headline\":\"6SN1123-1AA00-0EA1 Configuration and Setup\",\"datePublished\":\"2016-06-24T14:43:43+00:00\",\"dateModified\":\"2020-03-05T16:17:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/\"},\"wordCount\":362,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.mroelectric.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/2016\/07\/quote-btn.png\",\"keywords\":[\"Motors &amp; Drives\",\"Setup &amp; Configuration\"],\"articleSection\":[\"Siemens\",\"Troubleshooting &amp; Repair\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/\",\"url\":\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/\",\"name\":\"Siemens 6SN1123-1AA00-0EA1 Configuration and Setup\",\"isPartOf\":{\"@id\":\"https:\/\/www.mroelectric.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/2016\/07\/quote-btn.png\",\"datePublished\":\"2016-06-24T14:43:43+00:00\",\"dateModified\":\"2020-03-05T16:17:27+00:00\",\"description\":\"6SN1123-1AA00-0EA1 Configuration and Setup Information. MRO Electric and Supply has new and refurbished modules available with free same-day shipping.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#primaryimage\",\"url\":\"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/2016\/07\/quote-btn.png\",\"contentUrl\":\"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/2016\/07\/quote-btn.png\",\"width\":292,\"height\":62,\"caption\":\"Instant Quote\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.mroelectric.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"6SN1123-1AA00-0EA1 Configuration and Setup\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.mroelectric.com\/blog\/#website\",\"url\":\"https:\/\/www.mroelectric.com\/blog\/\",\"name\":\"MRO Electric Blog\",\"description\":\"Applications of PLCs, CNCs, and more!\",\"publisher\":{\"@id\":\"https:\/\/www.mroelectric.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.mroelectric.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.mroelectric.com\/blog\/#organization\",\"name\":\"MRO Electric and Supply\",\"url\":\"https:\/\/www.mroelectric.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.mroelectric.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/mro-logo-new_large2_blue-1.png\",\"contentUrl\":\"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/mro-logo-new_large2_blue-1.png\",\"width\":430,\"height\":222,\"caption\":\"MRO Electric and Supply\"},\"image\":{\"@id\":\"https:\/\/www.mroelectric.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/mroelectric\/\",\"https:\/\/x.com\/mroelectric\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.mroelectric.com\/blog\/#\/schema\/person\/b993515a2417163a23dfe88597c8d13a\",\"name\":\"Joe Kaminski\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.mroelectric.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/fb7c0d641ed541ad912b27609e8079304fc356be7b5b53578b32ad3fa973f506?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/fb7c0d641ed541ad912b27609e8079304fc356be7b5b53578b32ad3fa973f506?s=96&d=mm&r=g\",\"caption\":\"Joe Kaminski\"},\"description\":\"Joe Kaminski is an industrial automation specialist at MRO Electric. He has a background in industrial engineering and supply chain management. Joe has worked in the automation industry for over 10 years providing support to some of the largest companies in the world. For more info, visit www.mroelectric.com.\",\"url\":\"https:\/\/www.mroelectric.com\/blog\/author\/jadmin\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Siemens 6SN1123-1AA00-0EA1 Configuration and Setup","description":"6SN1123-1AA00-0EA1 Configuration and Setup Information. MRO Electric and Supply has new and refurbished modules available with free same-day shipping.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/","og_locale":"en_US","og_type":"article","og_title":"6SN1123-1AA00-0EA1 Configuration and Setup","og_description":"6SN1123-1AA00-0EA1 Configuration and Setup Information. MRO Electric and Supply has new and refurbished modules available with free same-day shipping.","og_url":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/","og_site_name":"MRO Electric Blog","article_publisher":"https:\/\/www.facebook.com\/mroelectric\/","article_published_time":"2016-06-24T14:43:43+00:00","article_modified_time":"2020-03-05T16:17:27+00:00","og_image":[{"url":"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/2016\/07\/quote-btn.png","type":"","width":"","height":""}],"author":"Joe Kaminski","twitter_card":"summary_large_image","twitter_creator":"@mroelectric","twitter_site":"@mroelectric","twitter_misc":{"Written by":"Joe Kaminski","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#article","isPartOf":{"@id":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/"},"author":{"name":"Joe Kaminski","@id":"https:\/\/www.mroelectric.com\/blog\/#\/schema\/person\/b993515a2417163a23dfe88597c8d13a"},"headline":"6SN1123-1AA00-0EA1 Configuration and Setup","datePublished":"2016-06-24T14:43:43+00:00","dateModified":"2020-03-05T16:17:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/"},"wordCount":362,"commentCount":0,"publisher":{"@id":"https:\/\/www.mroelectric.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/2016\/07\/quote-btn.png","keywords":["Motors &amp; Drives","Setup &amp; Configuration"],"articleSection":["Siemens","Troubleshooting &amp; Repair"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/","url":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/","name":"Siemens 6SN1123-1AA00-0EA1 Configuration and Setup","isPartOf":{"@id":"https:\/\/www.mroelectric.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#primaryimage"},"image":{"@id":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/2016\/07\/quote-btn.png","datePublished":"2016-06-24T14:43:43+00:00","dateModified":"2020-03-05T16:17:27+00:00","description":"6SN1123-1AA00-0EA1 Configuration and Setup Information. MRO Electric and Supply has new and refurbished modules available with free same-day shipping.","breadcrumb":{"@id":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#primaryimage","url":"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/2016\/07\/quote-btn.png","contentUrl":"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/2016\/07\/quote-btn.png","width":292,"height":62,"caption":"Instant Quote"},{"@type":"BreadcrumbList","@id":"https:\/\/www.mroelectric.com\/blog\/6sn1123-1aa00-0ea1-configuration-setup\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mroelectric.com\/blog\/"},{"@type":"ListItem","position":2,"name":"6SN1123-1AA00-0EA1 Configuration and Setup"}]},{"@type":"WebSite","@id":"https:\/\/www.mroelectric.com\/blog\/#website","url":"https:\/\/www.mroelectric.com\/blog\/","name":"MRO Electric Blog","description":"Applications of PLCs, CNCs, and more!","publisher":{"@id":"https:\/\/www.mroelectric.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mroelectric.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.mroelectric.com\/blog\/#organization","name":"MRO Electric and Supply","url":"https:\/\/www.mroelectric.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mroelectric.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/mro-logo-new_large2_blue-1.png","contentUrl":"https:\/\/www.mroelectric.com\/blog\/wp-content\/uploads\/mro-logo-new_large2_blue-1.png","width":430,"height":222,"caption":"MRO Electric and Supply"},"image":{"@id":"https:\/\/www.mroelectric.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/mroelectric\/","https:\/\/x.com\/mroelectric"]},{"@type":"Person","@id":"https:\/\/www.mroelectric.com\/blog\/#\/schema\/person\/b993515a2417163a23dfe88597c8d13a","name":"Joe Kaminski","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.mroelectric.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/fb7c0d641ed541ad912b27609e8079304fc356be7b5b53578b32ad3fa973f506?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fb7c0d641ed541ad912b27609e8079304fc356be7b5b53578b32ad3fa973f506?s=96&d=mm&r=g","caption":"Joe Kaminski"},"description":"Joe Kaminski is an industrial automation specialist at MRO Electric. He has a background in industrial engineering and supply chain management. Joe has worked in the automation industry for over 10 years providing support to some of the largest companies in the world. For more info, visit www.mroelectric.com.","url":"https:\/\/www.mroelectric.com\/blog\/author\/jadmin\/"}]}},"modified_by":"Brian Hughes","_links":{"self":[{"href":"https:\/\/www.mroelectric.com\/blog\/wp-json\/wp\/v2\/posts\/1068","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mroelectric.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mroelectric.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mroelectric.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mroelectric.com\/blog\/wp-json\/wp\/v2\/comments?post=1068"}],"version-history":[{"count":9,"href":"https:\/\/www.mroelectric.com\/blog\/wp-json\/wp\/v2\/posts\/1068\/revisions"}],"predecessor-version":[{"id":4511,"href":"https:\/\/www.mroelectric.com\/blog\/wp-json\/wp\/v2\/posts\/1068\/revisions\/4511"}],"wp:attachment":[{"href":"https:\/\/www.mroelectric.com\/blog\/wp-json\/wp\/v2\/media?parent=1068"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mroelectric.com\/blog\/wp-json\/wp\/v2\/categories?post=1068"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mroelectric.com\/blog\/wp-json\/wp\/v2\/tags?post=1068"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}